Section 73 updates rationalised servicing, cores and typical room plans within a mixed-use hotel, office and retail scheme, with revised elevations and roof plant.

THE BRIEF

A Section 73 submission was required to amend an extant consent for a mixed-use development of seven to ten storeys plus basement, comprising retail/food uses, offices and a hotel. The drawings show coordination changes driven by updated servicing, energy and fire strategy requirements, and operator room layouts.

Before
After

OUR SOLUTION

The basement footprint was reduced and reconfigured around hotel back-of-house, plant and a dedicated goods lift. At ground floor, the entrance, lobby/core arrangement and a defined deliveries route were adjusted, with a new substation within the courtyard. Upper floors were extended locally, the courtyard lightwell removed, and typical room layouts and windows rationalised.

Location:

Putney High Street, Putney

Type:

Hotel

Status:

Services provided:

Constraints:

CONTACT

If you'd like to discuss a project, send us a message using the form and we'll be in touch.

You can also give us a call to talk things through.

FOLLOW US

Curio Architects
Unit 205, The Print Rooms
164-180 Union Street
London
SE1 0LH

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.