NEW PROGRESS HOUSE, WALLINGTON

Office refurbishment with refreshed communal arrival, controlled access, and two re-planned floors combining open work areas, meeting spaces, and enlarged staff facilities.

THE BRIEF

Upgrade the communal entrance and shared areas, including a new lift and improved entrance security, while keeping tenant demises unchanged. Reconfigure internal office floors to replace fragmented rooms with clearer zoning, an enlarged kitchen/breakout, updated meeting provision, and an accessible WC at ground level.

Before
After

OUR SOLUTION

Re-planning centred on the stair/lift core. Ground floor works set a secure line and reorganised access to shared WCs and shower. The first floor was opened up into three zones—boardroom, kitchen/breakout, and open office with pods/booths. The second floor retained WCs/server room and became an open plan departmental layout with storage.

Location:

Wallington, Sutton

Type:

Office/Retail

Status:

Services provided:

Constraints:

CONTACT

If you'd like to discuss a project, send us a message using the form and we'll be in touch.

You can also give us a call to talk things through.

FOLLOW US

Curio Architects
Unit 205, The Print Rooms
164-180 Union Street
London
SE1 0LH

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.